Plumbing an ADU in San Jose: what to plan before you build
An ADU is a small house of its own, and its plumbing starts with three questions: how it reaches the sewer, whether the water service can feed two households, and how gas or electric heating will work.
- 4 min read
- San Jose focus
- Sept 2026 updated

Perfect Tankless Plumbing, San Jose, CA
Plumbing an ADU in San Jose means connecting the unit's drains to the existing sewer lateral or a new one, sizing the water service for two households, and either running gas to a new PG&E meter or going all-electric; planning these routes before the design is final avoids costly changes once concrete is poured.
San Jose's ADU boom
San Jose issued just 10 ADU building permits in 2015. The city now reports 1,500 ADUs permitted since 2022 and more than 1,100 final building permits issued, so backyard units and garage conversions are now a common project rather than a rare one.
Every one of them needs plumbing: drains to the sewer, water from the main service and, often, gas. The cost of that plumbing depends heavily on decisions made early in the design.
Getting to the sewer
Most backyard ADUs connect to the main house's existing sewer lateral through a new wye and cleanout. That works when the lateral is in good condition and the ADU sits high enough for its drains to flow downhill to the connection.
Before tying in, have the existing lateral inspected with a camera. Connecting a new unit to a cracked or root-filled clay line only moves the problem. Where the slope does not work, a sewage ejector pump can lift the waste, at added cost and with ongoing maintenance.

Water for two households
Two kitchens and two or more bathrooms running at once can be more than an older water service was sized for. A plumber calculates the combined fixture demand and checks the meter and service line size, then decides whether a new branch is enough or the service needs upsizing.
The ADU should have its own shutoff, so work on one unit does not leave the other without water. San Jose's fire plan review may also ask for a water company letter showing hydrant flow, with 1,000 gallons per minute at 20 psi as the benchmark.

Planning an ADU? Call with your site plan and we will map the sewer, water and gas routes.
Call (669) 281-0871Gas or all-electric
PG&E now requires ADUs to have their own utility meter. If the ADU will use gas, the piping has to run to the new meter location and be sized for the unit's appliances. Many owners choose an all-electric ADU instead, with a heat pump water heater, which avoids gas piping altogether.
Either way, decide early, because it changes where the water heater goes, what the electrical panel needs and how much trenching is required.
Garage and junior ADU conversions
Garage conversions usually need the slab cut for new bathroom and kitchen drains, since garages rarely have drains in the right place. The shortest route to the existing sewer line keeps the work and the patching to a minimum.
Junior ADUs inside the existing house often tie into nearby drains and supply lines, which makes them simpler and faster to plumb than a detached unit.
Timing the plumbing with the build
Underground plumbing goes in and is inspected before the foundation or slab is poured. Rough-in inside the unit follows framing, and finish plumbing comes after drywall. The city's first round of ADU building review typically takes about 20 business days, so having the plumbing plan ready keeps the design moving.
From the guide to the job
Services related to this guide
ADU and Garage Conversion Plumbing
Sewer tie-in or new lateral, Water and gas service to the unit.
How we handle adu and garage conversion plumbingSewer Camera Inspection
Point-of-sale lateral inspection, Locating and depth marking.
Sewer Camera InspectionHeat Pump Water Heater Installation
Hybrid 240V units, Condensate and clearance planning.
Hybrid 240V units and related work
FAQ
Questions readers ask about this
Usually, if the lateral is sound and the unit drains by gravity. Camera it first.
PG&E now requires ADUs to have their own utility meter.
A plumber calculates the combined demand and upsizes it if needed.
Before the design is final, so sewer, water and gas routes shape the plan.
Yes, usually by cutting the slab for drains that tie into the existing sewer line.
More guides
Keep reading
Trenchless vs Open-Cut Sewer Replacement in San Jose
Bursting, lining and open trench compared, with published San Jose ranges.
Trenchless vs Open-Cut Sewer Replacement in San JoseHeat Pump Water Heaters in Santa Clara County: A Guide
How they work, what the house needs and how they compare with gas options.
Heat Pump Water Heaters in Santa Clara County: A Guide
One number, any hour
Plan the ADU plumbing early
Call with your site plan. We will map sewer, water and gas before the design is final.